16t Hydraulic Jacks System for Tank Construction China Tank Farm Construction Solution

16t Hydraulic Jacks System for Tank Construction China Tank Farm Construction Solution

CZPT jacks technique for tank erection
Application of the 16t hydraulic jacks technique
The equipments are largely employed for vertical tank leading to base construction.
Also it can be used for mega function piece jacking or lifting.

 

Technical info for 16 t hydraulic jacks technique

one.pump station

Optimum force:25MPa

Electricity:11KW

Rated oil circulation:60L/min

Motor rotate speed:1470r/min

oil tank potential:360L

Program temperature :20-60ºC

oil filter precision:20υm

Voltage:220W

Method oil kind:L-HM46# antiwear hydraulic oil

Total weight:360Kg

Outsize(mm):1100*750*1000

 

 two.Jacks

theory lifting capacity:160KN

Rated lift ability:160KN

rated oil stress:16MPa

CZPT stroke:100±0.5mm

Glissade ability:≤5mm

excess weight:≤20Kg

Set up dimensions for up and down chuck: settle 3 *14U hole on the circumference of a φ120 circle

Dimensions(mm):a hundred and sixty*one hundred sixty*490

 

Ideal lifting rod:φ30round metal(forty five#)

 

chuck unit: screw mechanism

 

 3.Jack support

Whole peak:4460mm (will be confirmed soon after design)

CZPTing rod peak:3900mm

Slider stroke:3630mm (will be verified right after design)

 

distance between expansion loop help to ground:310mm

 

Principle of the 16t hydraulic jacks technique

Principle of the erection technique
The adhering to short description gives the operating process in define. It can in specific particulars be modified when essential.
Phase 1. The tank base – plates are put on the prepared basis and welded jointly.
Phase two. The beams or lattice operate of the roof are assembled and finally joined to the upper rim of the shell ring. 
Phase three. The jacking products is set up in the tank. The plates of the 2nd shell ring (next to the top ring) are positioned outside the house the first one.
Step4. The concluded portion of the tank (roof and top shell ring) is lifted hydraulically to a height at which the plates of the 2nd ring can be moved into location and the roof sheeting can be completed.
Step5. The plates of the 2nd shell ring are positioned just and welded collectively to the reduce edge of the very first ring.
Step6. The plates of the third shell ring are placed outside the house the 2nd shell ring.
Step7. The completed part of the tank (roof the two uppermost shell rings) is lifted.
Step8. The above cycle of functions is repeated until finally the previous (base) shell ring is concluded.
Step9. The total tank is lowered down to the bottom plate and welded to this.
Step10. The lifting gear is dismantled.

Photos

Following solutions:

Guarantee: 1 calendar year

Any components problems for the duration of the gurantee time, we provide the relevant areas for free of charge and supply specialized support in time.