Merchandise Introduction.
casting technological innovation | expense casting/silic sol expenditure casting/lost wax casting |
casting content | carbon metal, stainless metal, alloy metal and etc |
material common | AISI JIS GB DIN EN ASME |
casting components selection | auto elements, machinery areas, marine hardware areas, door lock areas, pump valve and pipe fittings areas, toilet hardware, kitchen components and so on |
casting fat | 2g-70kg |
floor finishing | sand blasting, stain sharpening, mirror sprucing, chrome plated, painted or as customer’s ask for |
machining | milling, drilling, grinding, CNC machining |
shipping and delivery time | 15days for generating molds and samples confirming, then 25-30days for demo get |
Goods Exhibiting
Manufacturing Approach
Our Workshop
Our Testing Euipments
Our Overseas Exhibtion Displaying
FAQ
1. How a lot of days it will consider to develop a single new item?
It will just take about 20days to make molds and make samples for your checking.
two. What is your typical supply time for a bulk production?
Generally twenty-30days after prepayment paid out
3. If we do not have associated drawings, could you make drawing for us?
Of course, we can. Only you supply us depth information about your samples, our engineer can make right drawings for you.
four. What is frequent payment conditions?
TT total payment for molds, then samples confirmed. The thirty% TT prepayment should be arranged, then equilibrium from BL copy.