Manual Operation Portable Air-Driven Gas Pressure Booster Hydraulic Test Pump System

Manual Operation Portable Air-Driven Gas Pressure Booster Hydraulic Test Pump System

Complex Parameter of CZPT
 

Gas Booster Technique
Undertaking parameter
Check medium 3.5MPa nitrogen or argon
Pushed strain three-8Bar
Optimum output strain 80MPa
Medium temperature Typical temperature
Ambient temperature Typical temperature
Management loop 1 way control loop
management method Guide procedure

Solution Description

We can make a variety of pneumo-hydraulic pressurization techniques in accordance to customers’ requirements. These programs can be employed for strain tensioning, hydraulic travel and handle, hydraulic check, and so forth. The highest force can be up to 6400bar.
CZPT Pneumo-hydraulic Pressurization Program has compact construction and is straightforward to work. What the end users require to do is only to lead the travel air to the liquid port, then adjust the stress regulating valve of the generate circuit to reach the needed operating pressure. 

Standard gas pressurization procedure

Standard applications:

one.  Static and burst take a look at for valves, pipe fittings, and so on.
2.  Test for auto brake method and nozzles.
three.  Chemical reagent injection into pipelines or response kettles.
four. Placing coolant into jars.
five.  Providing drive for clamping, forming, drilling, shearing and stamping devices.
six. Providing buffer and raise drive to safeguard molds when large presses overload.
seven. Static and dynamic test for aviation equipment.
eight. Efficiency test and calibration for instruments.
nine. Higher force cleaning and water injection of waterjet slicing equipment.
ten. Injecting oil into lubrication program of mechanical tools.
11. Supplying clamping drive for valve take a look at.
twelve. Offering push force for shaft sleeve and cylinder liner.
thirteen. Managing floor and underground protection valves.

Our factory

FAQ

one. Shipping Term: FOB HangCZPT, by vessel
2. Delivery Time: 15-twenty days
three. Payment Phrases: T/T (a hundred% to shell out by T/T )
4. Set up / Procedure / Support / Manual: In English
five. Guarantee: 1 12 months from the day of completion of the commissioning.
six. Pre-cargo CZPT: Supplier should demo run complete line at supplier’s manufacturing unit just before cargo.

About shipping

Fumigation wooden instances, which are well sealed and powerful enough for lengthy-phrase journey, and suited for multi-times loading & unloading by forklift.

 

Manual Operation Portable Air-Driven Gas Pressure Booster Hydraulic Test Pump System

Tags: